Last Date
Subtype of Pillar ChoiceThe last relevant date of the respective instrument should be used as curve building pillar associated with that instrument.
Here the qualifier "relevant" means that the referred date plays a role in the curve construction.
It is therefore possible that the relevant date does not necessarily coincide with the instrument's maturity date.
